这是描述信息
/
/
/
Instructions for installation and use of cryogenic centrifugal pumps

Instructions for installation and use of cryogenic centrifugal pumps

(Summary description)The position of the pump during installation is lower than the suction liquid level (if the installation position of the pump is higher than the suction liquid level, tank pumping is required before starting the pump).

Instructions for installation and use of cryogenic centrifugal pumps

(Summary description)The position of the pump during installation is lower than the suction liquid level (if the installation position of the pump is higher than the suction liquid level, tank pumping is required before starting the pump).

Information

1. The position of the pump during installation is lower than the suction liquid level (if the installation position of the pump is higher than the suction liquid level, tank pumping is required before starting the pump). Before use, check whether the rotation direction of the impeller is correct;
2. Whether the nut of the inlet and outlet pipe joints of the pump is tightened; the sealing ring between the pump cover and the pump body is the pump pad. The parts in contact with materials should be sterilized with steam before use to ensure food hygiene.

Cryogenic liquid pump

3. A butterfly valve should be installed at the outlet of the pump to control the flow. Do not operate under overload conditions for a long time to avoid damage to the motor.
4. After the pump is used, CIP cleaning should be carried out immediately to prevent the material from sticking. Manual cleaning is required if there is no CIP.
5. When cleaning, first use hot water to pass through, then disassemble, use a brush to wash all parts of the pump in contact with the material, then rinse with clean water, and then install it in sequence.
6. If there is material dripping on the ground after the pump casing during use, it indicates that the shaft seal is leaking. At this time, the mechanical seal device on the shaft can be checked. If the wear is severe or the seal is damaged, it should be replaced or ground before use.
 

Keyword:

Scan the QR code to read on your phone

If you are interested in our products, please contact us!

Contact Us
ZHENJIANG AGREEN CO.,LTD

Address: 810-812, 8th floor, Yaju business center, Runzhou District, Zhenjiang City, Jiangsu Province
Tel: 86 511-8521-1589 / 86 139-5140-0642 / 86 137-7535-2215
Fax: 86 511-8522-2589
Email: halley@agreenchem.com

language
中国
韩国
韩国
韩国
韩国
韩国

COPYRIGHT © 2020 ZhenJiang Agreen Gas Equipment Co., LTD.

SEO label   Hazardous Chemical Business License

business license